Uranium solubility and enrichment of accelerated basin de-inventory (ABD) material (enriched uranium) and depleted uranium will be tested when adde…
Grading of the exterior of 760-11G and the installation of a drainage system, to prevent further water intrusion.…
The site plans to complete additional roadway resurfacing on Road C this FY '24 (likely around the Mar/Apr timeframe). The section of roadway from …
The 151-1C and 151-2C substation batteries and battery racks will be replaced due to age and the batteries being obsolete.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
Replace All Non-Emergency Light Fixtures at 730-2B.…
Install Wi-Fi in Trailer 704-46Z and 45Z.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required. These excavation activiti…
To assess the effectiveness of the chloride-based volatility (CBV) process will be evaluated using mixed oxide (MOX) fuel. The process will have be…
The activity involves the analysis of radioactive samples located in 773-A B065/067 using a Thermal Ionization Mass Spectrometer (TIMS). Activities…