Replace 105-L transfer bay handrails.…
Install 20 feet X 24 feet carport shed for 607-67G trash pump.…
Install 4 UW(Universal Wiring) Drops in 730-4B Rm. 1000…
The H-Area Tank Farm (HTF) facility needs a permanent design for supplying Chromate Water (CRW) to Tanks 35-37 above grade due to a recent undergro…
Project will install a Fence around the laydown storage area on the north side of the USFS compound.…
This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes mechanical removal and disposition of ancillary eq…
SRSCRO will remove the excessed drill press at 784-1A.…
Development of ionic liquids will be investigated in 999-2W. Major activities include synthesis of ionic liquids (IL) with varying cation and anion…
This project will be evaluating various vacuum pumps for possible use in the SRS Tritium Facility.…
Vibromet polishing machine will be used for final, high-quality polishing of R and D samples.…