Flow Instrument FIT-7805 is to be replaced with new model at 210-S.…
Mixing of epoxy chemicals and aggregate on a small-scale to form samples of epoxy grout.…
This EEC covers special methods for the Radchem Group's postdoc projects, LDRD, nonroutine chemicals, etc.…
Operations in the x-ray diffraction laboratory (773-A C-119/123) in the Savannah River National Laboratory (SRNL) consisting of the following: a ra…
CM 4351 REPLACE HEATERS IN BM SHOP and 717-1N. CM 4369 INSTALL NEW WELDER and 717-1N. CM 4298 INSTALL PRESS BRAKE and 711-N. CM 4381 INSTALL NEW…
This EEC covers minor sheetrock repairs, painting and replacing damaged cove base in 704-N.…
Areas around the exterior of 763-52N have damaged exterior metal siding. Replace / repair the metal siding per scope of work.…
731-5N Repair East Door.…
Modification, alteration, maintenance, paving and striping of the gravel overflow parking lot in SWPF.…
This EEC addresses planned renovation activities within 704-L.…