999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
Upgrade men's and women's locker rooms in 704-K. Revision 1 is specific to the replacement of existing vinyl sheet flooring and extending work dura…
Replace Lift Station Pumps at 607-44H.…
Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…
Replace 248-H Wet Chemical Agent Cylinder due to Age…
Permeation testing of metal, ceramic, and polymer samples with hydrogen, deuterium, helium, argon, carbon monoxide, carbon dioxide, and nitrogen wi…
The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop a high-performance cat…
The Auger Spectrophotometer is a non-destructive technique used to analyze metal samples.…
Daily operation of microscopy and spectroscopy instruments in 735-A, D-137.…