Sam Rayburn Dam Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Southwestern Power Administration proposes to modify and reconstruct its Allen Radio Tower communications site as part of the Spectrum Relocation p…
Pressure Prediction and Hazard Avoidance Through Improved Seismic Imaging CX(s) Applied: A1, A9, A11 Date: 05/29/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project (Budget Period 1) CX(s) Applied: A9, A11 Date: 05/21/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, B3.6 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, A11, B3.11 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: A9, A11, B3.6, B3.11 Date: 12/19/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: A9, A11, B3.6, B3.11 Date: 12/19/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: A9, A11, B3.6, B3.11 Date: 12/19/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory