Categorical Exclusion Determinations: Oklahoma

Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Pressure Prediction and Hazard Avoidance Through Improved Seismic Imaging CX(s) Applied: A1, A9, A11 Date: 05/29/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project (Budget Period 1) CX(s) Applied: A9, A11 Date: 05/21/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, B3.6 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, A11, B3.11 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory