September 9, 2016
CX-015841: Categorical Exclusion Determination
RBDMS, FracFocus, States First, and Produced Water Initiatives for FY16 CX(s) Applied: A9, A11Date: 09/09/2016 Location(s): OklahomaOffices(s): National Energy Technology Laboratory
July 20, 2016
CX-015689: Categorical Exclusion Determination
Characterizing and Interpreting the In-Situ Strain Tensor During Carbon Dioxide Injection CX(s) Applied: B3.1, B3.7Date: 07/20/2016 Location(s): OklahomaOffices(s): National Energy Technology Laboratory
June 2, 2016
CX-016115: Gore Shield Wire Replacement Project
Categorical Exclusion Determination
March 24, 2016
CX-015188: Categorical Exclusion Determination
Gore Line Building Extension (Part B1.15) CX(s) Applied: B1.15Date: 03/24/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
March 3, 2016
CX-014714: Categorical Exclusion Determination
Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
November 20, 2015
CX-014539: Categorical Exclusion Determination
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
November 20, 2015
CX-014538: Categorical Exclusion Determination
Sam Rayburn Dam Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
April 16, 2015
CX-013909: Categorical Exclusion Determination
NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
December 10, 2014
CX-024398: Allen Radio Tower Construction Project
Southwestern Power Administration proposes to modify and reconstruct its Allen Radio Tower communications site as part of the Spectrum Relocation p…
May 29, 2014
CX-012125: Categorical Exclusion Determination
Pressure Prediction and Hazard Avoidance Through Improved Seismic Imaging CX(s) Applied: A1, A9, A11 Date: 05/29/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory