CX-023145: Sallisaw-Akins-Liberty Line 3005 Rebuild Project

Replace the existing wood structures with galvanized steel structures and replace the conductor, shield wire and grounding and associated transmiss…

Office of NEPA Policy and Compliance

August 27, 2020
Estimated Read Time   min

Replace the existing wood structures with galvanized steel structures and replace the conductor, shield wire and grounding and associated transmission elements along transmission line 3005 for 13.09 miles.