Acquire Easement for upgrade of anchors and guy wires on Structures 531 and 604; including vegetation removal within the newly acquired easement fo…
SWPA proposes to amend Contract-688 to reflect changes to the control and operation of certain equipment located at the Akins Interconnection. …
Task 10 of the Project SOPO - Field Laboratory Horizontal Well will be drilled and completed. This is a science well for the project. Location is 8…
Create a new Federal Register Notice (FRN) developed for 2021 to address issues with administration of the program and to accept new applications. …
Extend the existing Integrated System Rate Schedules. …
Replace 19 wooden structures along transmission line 3017 with steel structures and structural components in an area of annual flooding. …
Determine the thermo-poroelastic (THM) properties of FORGE-related rocks and study the role of THM in fracture closure process.…
CX-023411: Deepwater Methane Hydrate Characterization and Scientific Assessment (New land test site)
Project will conduct a land-based field test of a pressure coring system. Includes drilling of a test hole and the use of the equipment to cut, col…
Award Number: DE-EE0009181, CX(s) Applied: A9, B3.1, B3.6, Geothermal Technologies Office, Location(s): OK, Office(s): Golden Field Office
Replace the existing wood structures with galvanized steel structures and replace the conductor, shield wire and grounding and associated transmiss…