Southwestern Power Administration proposes to allow AEP-PSO to upgrade their equipment located within Southwestern's Tupelo Substation facility.…
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
RBDMS, FracFocus, States First, and Produced Water Initiatives for FY16 CX(s) Applied: A9, A11Date: 09/09/2016 Location(s): OklahomaOffices(s): National Energy Technology Laboratory
Characterizing and Interpreting the In-Situ Strain Tensor During Carbon Dioxide Injection CX(s) Applied: B3.1, B3.7Date: 07/20/2016 Location(s): OklahomaOffices(s): National Energy Technology Laboratory
Categorical Exclusion Determination
Gore Line Building Extension (Part B1.15) CX(s) Applied: B1.15Date: 03/24/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration