Maintenance and Modification of Well Test Reactor Area (TRA)-08CX(s) Applied: B3.1, B1.3Date: 03/31/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Idaho National Laboratory - Off-Road All Terrain Vehicle Use in Support of Engineering SurveysCX(s) Applied: B3.1Date: 03/31/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Test Reactor Area-609 Compressed Air System Drain Line Modification and Valve ReplacementCX(s) Applied: B2.5Date: 03/18/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Test Reactor Area-653 Heating, Ventilation, Air Conditioning ModificationsCX(s) Applied: B2.1, B2.5Date: 03/15/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Replace 200,000 Gallon Water Storage Tank at Material Fuels ComplexCX(s) Applied: B1.15Date: 03/15/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Characterization of Fluidized Beds by Pressure Fluctuation AnalysisCX(s) Applied: B3.6Date: 03/11/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
American Recovery and Reinvestment Act Reactive Tracers.CX(s) Applied: B3.6Date: 02/23/2010Location(s): Idaho Falls, IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Materials and Fuel Complex Dial Room Replacement ProjectCX(s) Applied: B1.7, B1.15Date: 02/05/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Central Facilities Area-696 Power and Plumbing UpgradesCX(s) Applied: B1.7, B2.1Date: 02/01/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Removal of Central Facilities Area (CFA)-661 Interior Walls and MezzanineCX(s) Applied: B1.15Date: 12/16/2009Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy