Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement CX(s) Applied: B2.2 Date: 07/24/2013 Location(s): Idaho Offices(s): Nuclear Energy
Next Generation Electromagnetic Pump: Analysis Tools and Insulation Materials Development - General Electric (GE) Hitachi Nuclear Energy Americas Limited Liability Corporation (LLC) CX(s) Applied: B3.6 Date: 07/24/2013 Location(s): Idaho Offices(s): N...
Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy
Water Security Test Bed (WSTB) CX(s) Applied: B3.6 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy
Land Mobile Radio - Bi Directional Amplifier (BDA) Installation CX(s) Applied: B1.7 Date: 03/21/2013 Location(s): Idaho Offices(s): Nuclear Energy
High Density Fuel Material for Light Water Reactors (LWRs) CX(s) Applied: B1.31 Date: 01/14/2013 Location(s): Idaho Offices(s): Nuclear Energy
Central Facilities Area (CFA)-696 Gasoline Tank Installation CX(s) Applied: B2.5 Date: 10/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Idaho Falls Power - Willow Creek Building Conduit Installation CX(s) Applied: B4.7 Date: 10/16/2012 Location(s): Idaho Offices(s): Nuclear Energy
Development of Light Water Reactor Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC CX(s) Applied: B3.6, B3.15 Date: 09/25/2012 Location(s): Florida, Wisconsin Offices(s): Nuclear Energy
Development of Light Water Reactor Fuels Enhanced Accident Tolerance - Westinghouse Electric Company LLC CX(s) Applied: B3.6 Date: 09/25/2012 Location(s): New Mexico Offices(s): Nuclear Energy