SiC-SiC Composite for Fuel Structure Applications – Electric Power Research Institute CX(s) Applied: B3.6 Date: 08/09/2012 Location(s): CX: none Offices(s): Nuclear Energy
Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area CX(s) Applied: B2.5 Date: 04/26/2012 Location(s): Idaho Offices(s): Nuclear Energy
Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Power Line Configuration 2013-1 CX(s) Applied: B4.13 Date: 04/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project CX(s) Applied: B2.2 Date: 04/07/2012 Location(s): Idaho Offices(s): Nuclear Energy
Central Facilities Area (CFA) Shoot House Panel Installation CX(s) Applied: B2.1 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
International Way Office Building Lease Termination CX(s) Applied: B1.24 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change CX(s) Applied: B1.31 Date: 03/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering - Rensselaer Polytechnic Institute CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): New York Offices(s): Nuclear Energy, Idaho Operations Office
An Integrated Upgrade of Scientific Equipment for Strengthening the Research and Education in Nuclear Energy at the Ohio State University CX(s) Applied: B1.2, B3.6 Date: 11/28/2011 Location(s): Ohio Offices(s): Nuclear Energy, Idaho Operations Office