CX-001411: Categorical Exclusion Determination

Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade ProjectCX(s) Applied: B2.5Date: 04/01/2010Location(s): Idaho Falls, IdahoOffice(s): Idaho Operations Office, Nuclear Energy

Office of NEPA Policy and Compliance

April 1, 2010
Estimated Read Time   min
Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project
CX(s) Applied: B2.5
Date: 04/01/2010
Location(s): Idaho Falls, Idaho
Office(s): Idaho Operations Office, Nuclear Energy

This project increases the Uninterrupted Power Supply (UPS) capacity in the Idaho Falls (IF)-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 kilovolt-amphere (KVA) and 36 KVA) and installing a 225 KVA system. An approximately 15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by September 2010. Total project costs are approximately $700,000.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD