Test Reactor Area-653 Heating, Ventilation, Air Conditioning ModificationsCX(s) Applied: B2.1, B2.5Date: 03/15/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Office of NEPA Policy and Compliance
March 15, 2010CX(s) Applied: B2.1, B2.5
Date: 03/15/2010
Location(s): Idaho
Office(s): Idaho Operations Office, Nuclear Energy
The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units and install six roof mounted HVAC units at the TRA-653 machine shop area.