Henderson-Mead Number 2 230-Kilovolt Transmission Line, Erosion Repair at Structure 2/4 CX(s) Applied: B1.3 Date: 09/11/2013 Location(s): Nevada, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Truckee Carson Irrigation District Hydro Project CX(s) Applied: B1.13, B4.12, B5.24 Date: 09/08/2014 Location(s): Nevada Offices(s): Golden Field Office Technology Office: Fuel Cell Technologies Award Number: DE-EE000084
Mead Substation Service Building Repairs CX(s) Applied: B1.3Date: 41879 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region
X-Ray Diffraction System to Enhance the Nuclear Materials Research and Education – University of Nevada Reno CX(s) Applied: B1.31Date: 41843 Location(s): NevadaOffices(s): Nuclear Energy
Vapor Intrusion Mitigation Pilot Study and Potential Full-Scale Sub-Slab Depressurization System Design/Build for Building 100 CX(s) Applied: B3.1, B6.1, B6.2 Date: 07/10/2014 Location(s): Florida Offices(s): Legacy Management
City of Las Vegas Solar Installations CX(s) Applied: B1.15, B5.16 Date: 06/13/2014 Location(s): Nevada Offices(s): Golden Field Office
Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Crossman Peak Communication Site Lease and Equipment Upgrades at 5 Facilities CX(s) Applied: B1.19 Date: 06/02/2014 Location(s): Arizona, Arizona, Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Recovery Act: Finding Large Aperture Fractures in Geothermal Resource Areas using a Three-Component Long-Offset Surface Seismic Survey, PSInSAR and Kinematic Analysis CX(s) Applied: A9, B3.1 Date: 05/13/2014 Location(s): Nevada Offices(s): Golden Fiel...
Henderson 230 Kilovolt Switchyard (Erosion Control) CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region