Creation of he linear sensor array involving circuit board design, system assembly and system testing.…
Testing of Optimized Formulation for acid simulation and validation under field conditions, and Field test Preparations, simulating field engineeri…
Bury 2-miles of aerial single phase electrical line feeding the Kings Mountain State Park in existing right-of-way.…
Bury 3-miles of aerial three phase line feeding the Kings Mountain Nat'l Military and State Parks in existing right-of-way. Single-phase line feed…
Office activities, lab-scale experiment for EM heating, gas analyzer, and community benefits activities, theoretical investigation, numerical model…
Front-End Engineering Design (FEED) Study for a Post-Combustion Carbon Capture (PCCC) system at Calpine's Pastoria Energy Facility (PEF) in Lebec, …
Plan development of the River Parish Sequestration Project, a CO2 transportation and storage solution, and site characterization. Conduct a pipeli…
Using directional boring techniques, install underground electrical distribution cable under state andfederal highways where presently overhead ele…
Preparation of lab samples includes sectioning, mounting (hot and cold methods), planar grinding, polishing, heat treating, chemical etching, and e…
Substation installation.…