BESS installation and microgrid creation at 3 locations to allow the locations to island during times of extreme weather. The microgrids will help …
Project management, Development of pre-FEED study of intermodal transport hub, Permitting and regulatory plan, Techno-economic assessment, Hazard i…
Planning characterization activities to include: office-based work such as data analysis, modeling, outreach, and permitting, and lab experiments. …
Geophysical work is conducted via conductivity/resistivity surveys and magnetic surveys. …
Pilot testing of carbon capture solvent in existing demonstration-scale amine plant and laboratory analysis of solvent samples.…
Remove and upgrade the existing Audio/Video equipment in MGN-B39-104 and MGN B39-415. The intent is to only replace mostly in place the existing eq…