Conduct well test activities. Increase depth of existing well, insert down-hole tool, and measure signal of the tool to properly convey information…
Conduct well test activities. Increase depth of existing well, insert down-hole tool, and measure signal of the tool to properly convey information…
Install 0.5 miles of new 3-phase 1/0 AL underground electrical distribution line and convert 1 mile of single phase 6A CWC overhead to 3-phase 4/0 …
Rebuild electrical distribution line. Convert 2.2 miles of single phase 6A and 8A CWC and reroute 0.3 miles overhead to single phase 1/0 Al URD und…
(1)replace distribution and transmission structures with higher wind rated poles to meet wind load criteria, (2)install an energy storage/delivery …
GD554 will be upgrading their primary distribution lines from 15kV to 25kV to allow for back feeding capabilities to decrease outage restoration ti…
Reconfigure power line insulators on 80 miles of Alaska Intertie transmission line tower structures between Willow and Susitna river crossing.…
PVREA proposes to modernize approximately five miles of three-phase main distribution line to provide its members with reliable power and the requi…
The City of Wray Electric System plans to acquire detailed photographs and thermal images of the utility infrastructure. …