Produce cost and design study that can be used to develop a plan for the potential future adaptation and modification and operation of the Watford …
The Town of Estes Park Power and Com. plans to underground approx. 1800 ft. of overhead cable and replace 2700 ft. of overhead cable with covered c…
Tri State plans to conduct a satellite analysis of their service territory to prioritize and identify areas of risk for vegetation-related outages …
This project focuses on replacing 3 compromised Pad mounted Transformer Vaults on Fire Island Wind.…
Remove old overhead power lines and poles, trench and bore with underground conduit. Pull new lines into underground conduit and make connections t…
This project plans to conduct work to establish a domestic supply chain for rare earth elements and critical minerals and materials, which includes…
Administrative and project management activities, computer modeling and analysis, field deployment of methane monitoring sensors (ground, vehicle, …
Upgrading 3 three-phase overcurrent protective reclosers and 4 single-phase overcurrent protective reclosers in, and near, Kelton Substation. All r…
Replacement of old poles (28), 13 transformers, 2250 ft of No. 1/0 acsr and 1350 ft of No. 4/0 acsr.…