he main objective of this project is to combine traditional and novel rare earth separation techniques for cost-effective production of individuall…
Removal of dead and dangerous trees outside of the existing ROW along multiple overhead distribution lines in Benton Harbor, Three Rivers, and Buch…
he main objective of this 2-year project is to develop and demonstrate modular microgrid systems to increase resilience against extreme weather con…
Activities planned include the cutting of dead trees at 5,701 locations in which 10 to 15 feet of the tree is left above ground level for wildlife …
Installation of covered conductor and associated pole replacement in Eastern Grants Pass, OR. …
The Recipient shall conduct basic research and development activities related to the usage of commercially available piezoelectric films and wafer …
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas