City to install two new feeder circuits (with appx. 10,260 of trenching) to be constructed for the New River Substation to be commissioned and put …
Installation of an Automated Metering Infrastructure System (AMI) - Replacement of electric meters with new meters capable of communicating with th…
Undergrounding circuits, installing Non-Expulsion Fuses, Vegetation management, Wood Pole Fire Resistant Coating, and Microgrid installation…
Drill characterization well collect site data populate models and simulations with data obtained.…
Installation of overhead equipment attached to new utility poles, except the ISG switchgear, which is the installation of a padmount vacuum switchg…
The U.S. Department of Energy (DOE) entered into a Partnership Intermediary Agreement (PIA) with a partnership intermediary (PI) in April 2023 for …
Prairie Energy Coop. will replace existing three-phase oil circuit reclosers with three-phase electronic reclosers in forty-nine locations that com…
The objective of the Illinois Basin West CarbonSAFE Phase III Project is to geologically characterize the Cambrian Mt. Simon Sandstone/Eau Claire F…
The proposed project activities include the undergrounding of approximately 6.25 miles of overhead power lines in high-risk wildfire areas prone to…