CX-032667: Fairbury West Transmission Project

The proposed project would replace existing line and install 1.5 miles of new, weather-resistant 34.5kV line between the West and East substations,…

Office of NEPA Policy and Compliance

December 10, 2024
minute read time

The proposed project would replace existing line and install 1.5 miles of new, weather-resistant 34.5kV line between the West and East substations, with the new line then continuing north and west through public right-of-way before tying into the existing 34.5kV