Four of the proposed locations for EV charger installations are at locations that are either within historic districts or are potentially eligible …
Project mgmt, NEPA doc, UIC Class VI permit prep, site characterization(4.1.4,4.3 only), storage field development plan, CO2 source feasibility stu…
SOPO Tasks 1 and 2 - Planning type activities. Many more locations will be added to this project. See attachment, "Form 451 Environmental_State of …
Drilling stratigraphic test well
Develop machine learning algorithms that will process electric utility data. Demonstrate in a utility's IT systems / network. …
Enhance and integrate existing digital twins for gas turbines, Rankine cycles, and Carbon Capture into a cohesive hydrogen gas turbine combined cyc…
Engineering and construction of a commercial scale system (2 units at 2,500 BPD oil capacity), followed by six months of field testing on a Bayswat…