Construction of new 46kV sub-transmission line for 2 City owned electrical substations. Installation of isolation switches in the 46kV sub-transmis…
A completed EQ is required for any TBD location sites/charging stations. A separate NEPA review is required for the TBD location sites. This CX cov…
The scope of this project include replacing wooden electric poles with steel ones and then installing software to enhance the grid's resilience.…
Project's primary objective is site characterization including water sample collection, drilling a USDW well, and aerial studies (Subtasks 4.7, 4.8…
The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the repl…
An advisory team will be built to engage stakeholders, Preferred Subcontractor/Sub-recipient L and T DES will baseline the current energy scenario …
Relocate existing OH distribution line to a more resilient road accessible underground line. Upgrading to an advanced switchgear yard within the ex…
Collection of acid mine drainage water from the Scaffold Lick and McKean 14 Properties site, the Boggs Rd Passive Treatment site, the Codogan site,…