CX-033842: MVEA Black Squirrel and Gresham SCADA Installation Project

MVEA proposes to upgrade the Black Squirrel and Gresham substations to be SCADA ready. This includes upgrading six existing substation recloser con…

Office of NEPA Policy and Compliance

May 2, 2025
minute read time

MVEA proposes to upgrade the Black Squirrel and Gresham substations to be SCADA ready. This includes upgrading six existing substation recloser controls at Gresham substation and installing a Team-Time Automation Controller (RTAC).