Feasibility assessment of bench scale system for methanol production and conceptual 50,000 tonnes per year plant.…
Four of the proposed locations for EV charger installations are at locations that are either within historic districts or are potentially eligible …
Project mgmt, NEPA doc, UIC Class VI permit prep, site characterization(4.1.4,4.3 only), storage field development plan, CO2 source feasibility stu…
SOPO Tasks 1 and 2 - Planning type activities. Many more locations will be added to this project. See attachment, "Form 451 Environmental_State of …
Drilling stratigraphic test well
Develop machine learning algorithms that will process electric utility data. Demonstrate in a utility's IT systems / network. …
Enhance and integrate existing digital twins for gas turbines, Rankine cycles, and Carbon Capture into a cohesive hydrogen gas turbine combined cyc…