Slipstream field capture studies are planned over a 3-month period at Milton R. Young Power Station (MRY) located near Center, North Dakota. EERC p…
Demonstrate a novel coal-to-PU foam process at bench scale and establish a straightforward path to near-term commercial production.…
Engineering design of gas injection into subsurface, geologic modeling and reservoir simulation, laboratory evaluation of core and fluid samples, i…
Laboratory studies and experiments that will support the design of a first-of-a-kind (FOAK) CO2 mineralization technology for field testing at the …
This project includes replacement of the potable water pipes and fire water pipes on the 900 plateau and near Building 167.…
Phase II activities will include completing the NEPA and permitting process, revising the Front-End Engineering Design (FEED) if required, revising…
The overall objective of the project is to significantly improve the reliability and efficiency of existing coal-fired power plants under flexible …
Coal pyrolysis in existing facilities. Collection and upgrading of tars and oils in existing upgrading equipment for further utilization as feedsto…
This project aims at developing and validating low-cost spinel-based materials synthesized with a multi-component alloy precursor for solid oxide f…