Phase II activities will include completing the NEPA and permitting process, revising the Front-End Engineering Design (FEED) if required, revising…
The overall objective of the project is to significantly improve the reliability and efficiency of existing coal-fired power plants under flexible …
Coal pyrolysis in existing facilities. Collection and upgrading of tars and oils in existing upgrading equipment for further utilization as feedsto…
This project aims at developing and validating low-cost spinel-based materials synthesized with a multi-component alloy precursor for solid oxide f…
Project activities include the design, development, and field testing of environmentally safe contrast agents and geophysical methods to assess the…
B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
The objective of Phase II is to build on the pre-FEED work completed in Phase I and be prepared to begin a detailed engineering design and construc…
USGS will measure surface water methane and CO2 concentrations and other parameters required to calculate the sea-air exchange of these greenhouse …
RTI proposes to design and engineer novel surface treatments and secondarily applied remediation components to mitigate biofilm growth on condenser…
Laboratory-based examinations of rich gas interactions with reservoir fluids and tight rocks