Installation of a 110/208v back-up generator for Building 17. …
Replace the failing cooling tower for Buildings 23 and 24 with a new tower. …
Build a self-supporting metal structure with electrical charging stations & safety eye washes to centralize the charging of the site forklifts & ma…
Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…
Install a new code and ADA compliant sidewalk on the North Side of Building 1. …
Demonstrate the application of the use of an advanced multigamma attenuation (MGA) sensor to accurately and precisely measure coal properties at th…
Demonstration of multiple operational methodologies and improved materials capability vs. baseline to improve efficiency, reliability, and flexibil…
Completion of FEED study, NEPA, and permitting for 10 MWe CO2 absorption pilot at CWLP host site, TEA update, and updating costs and schedules for …
Design, install, and operate a plasma ignition system at full scale to validate achievement of lower load, improved flame stabilization, lower oper…
Develop a Blockchain-based provenance platform that would track data flow traffic from sensors deployed in fossil-based power plants and detect ide…