Replace boiler #3 in B39. Work includes removing existing boiler #3 including disconnecting all electrical and plumbing and installing new boiler i…
Conduct a seismic source evaluation if traditional vibration trucks or dynamite is required for successful surface reflection survey in the area (r…
The overall goal of the proposed work is to design, construct, and test an ash fouling free air pre-heater to reduce minimum load requirements, inc…
Duke University will investigate the chemical forms of arsenic and selenium in coal fly ash and improve methods for characterization.…
Design, engineer, fabricate, lab test, and then field test a well logging system for unconventional boreholes.…
Complete a FEED study for the FPO pilot plant. Complete the NEPA and permitting process. Secure commitments of project partners. Update TEA for FPO…
RTI proposes to design and engineer novel surface treatments and secondarily applied remediation components to mitigate biofilm growth on condenser…
Computer data analysis, computer modeling, project reporting. Lab work to fabricate, characterize, calibrate, and test acoustic and magnetic fiber …
Computational simulations of sCO2 combustor, experimental measurements in non-reacting sCO2 loop. …
This project aims to develop a novel end-to-end trainable Deep Analysis Net with Causal Embedding for Coal-fired power plant Fault Detection and Di…