Project activities include the design, development, and field testing of environmentally safe contrast agents and geophysical methods to assess the…
B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
The objective of Phase II is to build on the pre-FEED work completed in Phase I and be prepared to begin a detailed engineering design and construc…
USGS will measure surface water methane and CO2 concentrations and other parameters required to calculate the sea-air exchange of these greenhouse …
RTI proposes to design and engineer novel surface treatments and secondarily applied remediation components to mitigate biofilm growth on condenser…
Laboratory-based examinations of rich gas interactions with reservoir fluids and tight rocks
Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection and pr…
This project will develop and demonstrate a new technology for large-volume and targeted comminution of rock in low permeability formations to enha…
The overall goal of the proposed project is to design and build a pilot plant to facilitate performance assessment, to acquire operational experien…