Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching)CX(s) Applied: B1.3Date: 10/19/2010Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office
Bio-Response Operational Testing and Evaluation (BOTE) Project (TA-I, TA-III, and Offsite at Idaho National Laboratory)CX(s) Applied: B3.12Date: 10/12/2010Location(s): IdahoOffice(s): Sandia Site Office
Replace Spacer Dampers Along the Dworshak PH-Dworshak Number 1 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 10/05/2010Location(s): Clearwater County, IdahoOffice(s): Bonneville Power Administration
Fire Protection Upgrade Major Construction Project CX(s) Applied: B1.15, B1.16, B2.2, B2.5 Date: 09/25/2010 Location(s): Idaho Offices(s): Naval Nuclear Propulsion Program
Geothermal Technologies Program: Blaine School District Geothermal Project (Phase 2)CX(s) Applied: B5.1Date: 09/20/2010Location(s): IdahoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Boise City Geothermal System Expansion, Phase 2CX(s) Applied: A9Date: 09/14/2010Location(s): Boise, IdahoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Idaho National Laboratory - United States Geological Survey (USGS) Geotechnical Drilling Program (USGS 136)CX(s) Applied: B3.1Date: 09/09/2010Location(s): Snake River Plains, IdahoOffice(s): Nuclear Energy, Idaho Operations Office
Idaho-Tribe-Nez Perce TribeCX(s) Applied: A9, A11, B2.5, B5.1Date: 09/09/2010Location(s): IdahoOffice(s): Energy Efficiency and Renewable Energy
Fiscal Year 2010 Albeni Falls Wildlife Mitigation ? Priest River (Flesher)CX(s) Applied: B1.25Date: 09/08/2010Location(s): Bonner County, IdahoOffice(s): Bonneville Power Administration
Agreement in Principle, Idaho National Laboratory Oversight, Idaho Department of Environmental QualityCX(s) Applied: A9, B3.1Date: 09/06/2010Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office