Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property CX(s) Applied: B1.25 Date: 04/24/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Power Line Configuration 2013-1 CX(s) Applied: B4.13 Date: 04/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project CX(s) Applied: B2.2 Date: 04/07/2012 Location(s): Idaho Offices(s): Nuclear Energy
Sitewide Categorical Exclusion for Research Activities in Aquatic Environments CX(s) Applied: B3.16 Date: 03/28/2012 Location(s): Oregon, Washington, Idaho Offices(s): Pacific Northwest Site Office
Central Facilities Area (CFA) Shoot House Panel Installation CX(s) Applied: B2.1 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
International Way Office Building Lease Termination CX(s) Applied: B1.24 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change CX(s) Applied: B1.31 Date: 03/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application CX(s) Applied: B3.6 Date: 02/24/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: B3.6 Date: 02/16/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory