Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project CX(s) Applied: B2.2 Date: 04/07/2012 Location(s): Idaho Offices(s): Nuclear Energy
Sitewide Categorical Exclusion for Research Activities in Aquatic Environments CX(s) Applied: B3.16 Date: 03/28/2012 Location(s): Oregon, Washington, Idaho Offices(s): Pacific Northwest Site Office
Central Facilities Area (CFA) Shoot House Panel Installation CX(s) Applied: B2.1 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
International Way Office Building Lease Termination CX(s) Applied: B1.24 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change CX(s) Applied: B1.31 Date: 03/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application CX(s) Applied: B3.6 Date: 02/24/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: B3.6 Date: 02/16/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Hatwai 230-Kilovolt Substation Breaker Replacement CX(s) Applied: B4.6 Date: 02/09/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration