Idaho Petroleum Reduction Leadership Project CX(s) Applied: A1 Date: 12/27/2012 Location(s): Idaho Offices(s): National Energy Technology Laborato...
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study CX(s) Applied: B3.1 Date: 12/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
INTEC – U-233 Waste Stream Disposition CX(s) Applied: NO CX GIVEN Date: 12/15/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Advanced Test Reactor (ATR) Transition to Commercial Power CX(s) Applied: B2.5 Date: 12/05/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office
INTEC – Suspect RH-TRU (AMWTP) CX(s) Applied: NO CX GIVEN Date: 11/23/2012 Location(s): Idaho Offices(s): Idaho Operations Office
CPP-684 – Remote Analytical Laboratory Facility Modifications CX(s) Applied: B1.28 Date: 11/06/2012 Location(s): Idaho Offices(s): Idaho Operations Office
ICP Routine Maintenance CX(s) Applied: B1.3 Date: 11/06/2012 Location(s): Idaho Offices(s): Idaho Operations Office