Test Reactor Area - 680 Road Widening CX(s) Applied: B1.32 Date: 09/23/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
National Oceanic and Atmospheric Administration Project Sagebrush Atmospheric Tracer Dispersion Study Revision 1 CX(s) Applied: B3.1 Date: 09/13/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Decommissioning of Shallow Injection Wells at the Advanced Test Reactor Complex CX(s) Applied: B5.3 Date: 08/29/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Willow Creek Building Pedestrian Bridge Replacement CX(s) Applied: B2.5 Date: 08/25/2009 Location(s): Idaho Offices(s): Idaho Operations Office
Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF) CX(s) Applied: B6.6 Date: 08/16/2013 Location(s): Idaho Offices(s): Nuclear Energy
University Boulevard Water Meter Installation CX(s) Applied: B2.2 Date: 08/14/2013 Location(s): Idaho Offices(s): Nuclear Energy
ZIRCEX Nuclear Fuel Dissolution Testing CX(s) Applied: B3.6 Date: 08/12/2013 Location(s): Idaho Offices(s): Nuclear Energy
United States Geological Survey (USGS) Geotechnical Drilling for USGS 139 CX(s) Applied: B3.1 Date: 08/08/2013 Location(s): Idaho Offices(s): Nuclear Energy
Wildland Fire Chainsaw Training CX(s) Applied: B1.2 Date: 08/01/2013 Location(s): Idaho Offices(s): Nuclear Energy