Replacement of Control Panel 670-E-80 (Outer Shim and Safety Rod Drive Motor Control Centers) CX(s) Applied: B2.2Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-774 Substation Equipment Upgrades CX(s) Applied: B2.5Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
SAM-1 Hydraulic Shuttle Irradiation System (HSIS) Experiments CX(s) Applied: B3.6Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
Experimental Verification of Post-Accident IPWR Aerosol Behavior - Electrical Power Research Institute, Inc. CX(s) Applied: B3.6Date: 02/25/2015 Location(s): IdahoOffices(s): Nuclear Energy
Heyburn Substation Heating, Ventilation and Air Conditioning (HVAC) Replacement CX(s) Applied: B1.4Date: 02/25/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Advanced Test Reactor Air Conditioning Upgrades CX(s) Applied: B1.4Date: 02/19/2015 Location(s): IdahoOffices(s): Nuclear Energy
Bond Strength Laser Shock Testing CX(s) Applied: B1.31Date: 02/18/2015 Location(s): IdahoOffices(s): Nuclear Energy
Ceramic Sensor Experiments in the Analytical Laboratory CX(s) Applied: B3.6Date: 02/17/2015 Location(s): IdahoOffices(s): Nuclear Energy
Installation of Emergency Eyewash/Shower Station in Room B6 of the Radiochemistry Laboratory CX(s) Applied: B2.3Date: 02/17/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP-666 (2) CX(s) Applied: B6.3Date: 02/15/2015 Location(s): IdahoOffices(s): Nuclear Energy