Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office
INTEC – Suspect RH-TRU (AMWTP) CX(s) Applied: NO CX GIVEN Date: 11/23/2012 Location(s): Idaho Offices(s): Idaho Operations Office
CPP-684 – Remote Analytical Laboratory Facility Modifications CX(s) Applied: B1.28 Date: 11/06/2012 Location(s): Idaho Offices(s): Idaho Operations Office
ICP Routine Maintenance CX(s) Applied: B1.3 Date: 11/06/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Central Facilities Area (CFA)-696 Gasoline Tank Installation CX(s) Applied: B2.5 Date: 10/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Idaho Falls Power - Willow Creek Building Conduit Installation CX(s) Applied: B4.7 Date: 10/16/2012 Location(s): Idaho Offices(s): Nuclear Energy
2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration
Provision of Funds to the Shoshone-Paiute Tribes of the Duck Valley Reservation (Shoshone-Paiute Tribes) to Purchase Five Parcels of Land in Owyhee County, Idaho CX(s) Applied: B1.25 Date: 09/04/2012 Location(s): Idaho Offices(s): Bonneville Power Adm...
Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching CX(s) Applied: B1.2 Date: 08/30/2012 Location(s): Idaho Offices(s): Nuclea...
Area 4: Reactive Transport Models with Geomechanics to Mitigate Risks of Carbon Dioxide Utilization and Storage CX(s) Applied: A9 Date: 08/13/2012 Location(s): Idaho Offices(s): National Energy Technology Laboratory