Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 2, 2014Swan Valley-Teton Overhead Fiber Line Install
CX(s) Applied: B4.6
Date: 06/02/2014
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to install less than a mile of overhead fiber lines on the Swan Valley-Teton 115-kilovolt transmission line from the BPA Swan Valley Substation to the BPA Swan Valley Radio Site (at BPA Structure 1/7).
CX(s) Applied: B4.6
Date: 06/02/2014
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to install less than a mile of overhead fiber lines on the Swan Valley-Teton 115-kilovolt transmission line from the BPA Swan Valley Substation to the BPA Swan Valley Radio Site (at BPA Structure 1/7).