This revision includes the updated facility number, floorplan, and additional projects that will be transferred to the Lindsay Blvd Complex (IF-695…
An N and HS Sponsor requires a remote communications facility for testing and training at Cell Site 6 - INL/CITRC/ARA (43032'00"N 112049'50"W). The…
The scope of this effort includes installation of a new generator, the associated support systems required for operation (cooling, lube oil, fuel, …
BPA would be selling the East Hills Substation to South Side Electric. The new change of ownership at East Hills Substation would be the point at …
Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…
The Radiological Response Training Range (RRTR) was established to allow first response entities to exercise tactics, techniques, and procedures in…
BPA proposes to fund Trout Unlimited (TU) to replace a roadway culvert on Muddy Springs, located on the Pahsimeroi River in Custer County, two mile…
Bonneville Power Administration (BPA) proposes to replace the 6 GHz digital radio equipment system located at Horse Butte and Birch Creek Radio Sta…
The purpose of this project is to excavate the old Naval Ordinance Testing Facility (NOTF) located directly south of EBR-1 along the railroad track…