This revision includes the temporary use of the following rental equipment for a test at the Idaho National Laboratory (INL) Power Burst Facility (…
The objectives of this project are to develop and demonstrate HTE for efficient hydrogen production from steam using solid-oxide electrolysis cells…
BPA proposes to fund the Nez Perce Tribe (NPT) to survey and treat noxious weeds/invasive plants in the Lapwai Creek watershed to minimize their sp…
This revision of the Idaho National Laboratory (INL) Cell Site 6 expansion at the Critical Infrastructure Test Range Complex (CITRC) includes an up…
The Naval Reactors Facility Transporter Transfer Path General Plant Project will replace the existing hydraulic lifting machine transfer pathway with a new transporter transfer path.
The purpose of the proposed action is to investigate the longevity and efficacy of proposed materials for fast reactors.…
The goal of this project is to enable decarbonized methanol synthesis by demonstration of a novel, high yield and deactivation resilient catalyst i…
This revision captures additional scope associated with the Westinghouse eVinci™ Micro Reactor program. The proposed action supports the need for a…
Bonneville Power Administration (BPA) proposes to fund the Custer County Soil and Water Conservation District to replace an undersized culvert with…
This activity will excavate, remove, and dispose of underground legacy vessels (presumed septic tank and distribution box) and associated piping/co…