This revision covers moving the proposed action from the National Security Test Range (NSTR) as evaluated in Revision 2 to an area next to the Cent…
Bonneville Power Administration (BPA) proposes to purchase Salmon River Electric Cooperative, Inc. (SREC) equipment located in the switchyard of BP…
This Idaho National Laboratory (INL) project includes the following revisions: Removal of the existing Radiological Response Training Range (RRTR) …
Several buildings at NRF will need to be modified in order to establish the VTRs. The modifications include replacing access doors, installing electrical and communication infrastructure, installing vestibules outside of select buildings, and installing secure lockers to store portable electronic devices.
Bonneville Power Administration (BPA) proposes to fund Latah Soil and Water Conservation District (Latah SWCD) to perform maintenance at previously…
To support the DOE mission, INL proposes to conduct smallscale research and development (R
This revision includes an update to the experiment campaign at the Transient Reactor Test Facility (TREAT) at the Idaho National Laboratory (INL) a…
This revision includes the temporary use of the following rental equipment for a test at the Idaho National Laboratory (INL) Power Burst Facility (…
The objectives of this project are to develop and demonstrate HTE for efficient hydrogen production from steam using solid-oxide electrolysis cells…
BPA proposes to fund the Nez Perce Tribe (NPT) to survey and treat noxious weeds/invasive plants in the Lapwai Creek watershed to minimize their sp…