The objective of the MFC- 793 and MFC-793C Perma-Con containment project is to provide and construct a permanent modular containment structure to…
The Central Facilities Area (CFA) is in need of a bigger structure to store sand and salt for winter road applications. The new structure will be n…
The purpose of the proposed action is to address the need for understanding, developing, and applying control schemes, architecture, and behavior o…
The Idaho National Laboratory (INL) Wireless Test Bed (WTB) USG 129 Customer has requested the use of the INL test range to perform radio frequency…
The USGS gage at Big Lost R at Lincoln Blvd Bridge (13132535) needs to be relocated due to ongoing issues with the current location. Part of this w…
The scope of work will include removing one existing spruce tree and stump located to the southeast of TRA-649 due to "line of sight" security conc…
This revision includes additional nearby locations for the placement of the existing two test generators (testing exemption – no APAD required) to …
For the Fiscal Year (FY)-24, INL’s LDRD program focuses on the laboratory’s five strategic initiatives: INL’s three emerging core capabilities, one…
As part of the ATR electrical system upgrades, the 670 -M-42 and M-43 Diesel Generators (50 yrs old) are to be replaced and relocated to the area…
BPA proposes to fund the Shoshone-Paiute Tribe to install two 24-inch diameter culverts at existing unimproved vehicle fords in Warm Springs Creek …