During a walkdown of EBR-I on 10 April 2024 to determine pre-season maintenance needs [EBR-I Interior Maintenance, EBR-I Parking Area Maintenance a…
NOAA has been working with the INL to find a suitable location for a new tower and the new desired location is just south of the Lincoln Gravel Pit…
This Idaho National Laboratory (INL) project includes the following revisions: Placement of a tent (14'x8') in the former area of the RRTR Trailer …
This revision covers moving the proposed action from the National Security Test Range (NSTR) as evaluated in Revision 2 to an area next to the Cent…
Bonneville Power Administration (BPA) proposes to purchase Salmon River Electric Cooperative, Inc. (SREC) equipment located in the switchyard of BP…
This Idaho National Laboratory (INL) project includes the following revisions: Removal of the existing Radiological Response Training Range (RRTR) …
Several buildings at NRF will need to be modified in order to establish the VTRs. The modifications include replacing access doors, installing electrical and communication infrastructure, installing vestibules outside of select buildings, and installing secure lockers to store portable electronic devices.
Bonneville Power Administration (BPA) proposes to fund Latah Soil and Water Conservation District (Latah SWCD) to perform maintenance at previously…
To support the DOE mission, INL proposes to conduct smallscale research and development (R
This revision includes an update to the experiment campaign at the Transient Reactor Test Facility (TREAT) at the Idaho National Laboratory (INL) a…