BPA proposes to fund the Nez Perce Tribe to replace an old, unsafe, wooden bridge on a private road in Clearwater County, Idaho. The bridge crosses…
This scope of this project is upgrading the access to CITRC Pad D. Current condition do no allow for use of the test pad in inclement weather. A gr…
BPA proposes to fund the Nez Perce Tribe (NPT) to implement projects that improve riparian habitat along Lapwai Creek and its tributaries, includin…
Oklo is developing next-generation fission power plants to produce abundant, affordable, clean energy.…
BPA proposes to fund the Nez Perce Tribe to replace three culverts in Sally Ann Creek Road, a county road in Idaho County, Idaho. …
The scope of the Facility Storage Area General Plant Project includes constructing a permanent foundation for a modular steel building approximately 200 square feet in size.
The customer would like to add test areas down around RWMC. This will include Van Buren Blvd from US 20/26 to EBR, Adams Blvd from Van Buren to RWM…
BPA proposes to fund the Custer Soil and Water Conservation District to drill two wells in Custer County, one mile southwest of May, Idaho. These w…
The Idaho National Laboratory Site has a multitude of roads and rights-of-way (ROW) including highways, rail lines, paved roads, pedestrian walkway…
The U.S. Department of Energy (DOE) is proposing to provide funding to Boise State University (Boise State) to design and test an acoustic bat dete…