This revision of the Idaho National Laboratory (INL) Cell Site 6 (CS6) expansion at the Critical Infrastructure Test Range (CITRC) includes the fol…
Office of NEPA Policy and Compliance
December 9, 2024This revision of the Idaho National Laboratory (INL) Cell Site 6 (CS6) expansion at the Critical Infrastructure Test Range (CITRC) includes the following installations: Two (2) 50' tall wooden power poles to the east of existing pole 56-46-23, A 10kva pole mount transformer will be installed at the top of pole 56-46-23 and triplex power conductors routed to the first power pole, and A single RGS conduit and associated conductors will be routed from the 100-amp panel to the second wooden pole.