PNNL Projects Involving Routine Maintenance in the 300 Area CX(s) Applied: B1.3 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Involving Siting, Modifying and Operating Support Buildings on the Hanford Site CX(s) Applied: B1.15 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area CX(s) Applied: B2.5 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Support Buildings CX(s) Applied: B1.15 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Relocation of Buildings CX(s) Applied: B1.22 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Facility Safety and Environmental Improvements CX(s) Applied: B2.6 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Disconnection of Utilities CX(s) Applied: B1.27 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Small-Scale Research and Development Projects Using Nanoscale Materials, 300 Area CX(s) Applied: B3.15 Date: 05/21/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Pacific Northwest National Laboratory Microbiological and Biomedical Research Projects in the 300 Area CX(s) Applied: B3.12 Date: 05/21/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Capability Enhancement at the 325 Hazardous Waste Treatment Units CX(s) Applied: B6.6 Date: 04/16/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office