CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08/03/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Site Characterization and Environmental Monitoring on the Hanford Site CX(s) Applied: B3.1 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Biomedical Research 300 Area CX(s) Applied: B3.12 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Small Scale Research CX(s) Applied: B3.6 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Routine Maintenance 300 Area CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Siting, Modifying and Operating Support Buildings CX(s) Applied: B1.15 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Safety Environmental Improvements 300 Area CX(s) Applied: B2.5 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Nesting Bird Deterrent Study at the 241-C Tank Farm CX(s) Applied: B3.8 Date: 07/26/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Mission Support Alliance Shutdown of Waste Sampling and Characterization Facility CX(s) Applied: B1.28 Date: 04/10/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Project S-234, Patrol Training Academy Firing Range Realignment CX(s) Applied: B1.15 Date: 03/28/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office