Project L-840: Export Water Line Replacement, 2901Y to 200W CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 41849 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
300-296 Waste Site Retrieval Pilot Project CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Radiological Survey 600 Area Supporting Land CX(s) Applied: B3.1 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Projects Involving Small-Scale Research and Development, Laboratory Operations, and Pilot Projects in the 300 Area CX(s) Applied: B3.6 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office