CH2MHill Plateau Remediation Company - Safety and Environmental Improvements of a Facility and Replacement/Upgrade of Facility Components CX(s) Applied: B2.5 Date: 11/06/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Activity-Specific Categorical Exclusion for the Transfer of 712 Complex Buildings and Land CX(s) Applied: B1.24 Date: 11/02/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company - Small-scale Research and Development, Laboratory Operations, and Pilot Projects CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company - Siting, Construction, and Operation of Support Buildings and Support Structures CX(s) Applied: B1.15 Date: 10/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
300 Area Electrical Service Project CX(s) Applied: B4.12 Date: 10/02/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation CX(s) Applied: B4.13 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Project Z-064, Waste Sampling and Characterization Facility Heating, Ventilation, and Air Conditioning System Upgrade CX(s) Applied: B2.1 Date: 09/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company - Routine Maintenance and Custodial Services CX(s) Applied: B1.3 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Project L-718, Electrical Utilities Transformer Management Support Facility CX(s) Applied: B1.15 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office